Federal State Budgetary Institution “Moscow Canal”
Contract No. 15-OK-55/17 dated 28.12.2017.
Execution of design work, passing a non‑state expert review of the design documentation and a state expert review to verify the accuracy of the estimated cost for the project: “Overhaul of the facades of the buildings of the Ivankovo hydraulic structures, No. 2, No. 3, No. 6, and the barrier gates No. 103” — from 28.12.2017 to 10.12.2018.
Contract No. 15-OK-40/17 dated 13.11.2017.
Execution of design work, passing of non‑state examination of design documentation and state examination to verify the accuracy of the estimated cost determination for the updating of the project “Capital repair of concrete walls of lock chambers Nos. 10U, 1–9” — from 13.11.2017 to 01.08.2018.
Contract No. SP44-18 dated 01.01.2018.
Order No. 40 dated 29.08.2018
Development of pre‑design studies for PJSC “Severstal”. CSP. Reconstruction of the coastal pier — from 29.08.2018 to 17.12.2018
Contract No. 0373100134619000249 dated 28.08.2019
Updating the design and estimate documentation, passing the state examination of the design documentation and the state examination to verify the reliability of determining the estimated cost of the facility: "Development and implementation of a comprehensive project for the reconstruction of infrastructure facilities of the Moscow Canal" stage 2. “Reconstruction of Hydraulic Unit No. 3 (Sub‑Stage 1)” — from 28.08.2019 to 31.03.2020
Contract No. 0373100134619000262 dated 19.09.2019.
Completion of design work, passing the state examination of design documentation and the state examination to verify the accuracy of the estimated cost of reconstruction, and a historical and cultural examination (if necessary) for the project: “Reconstruction of the slopes and towpaths of Canal No. 283” — from 19.09.2019 to 15.12.2020.
Contract No. 0373100134619000304 dated 01.10.2019.
Completion of design work, passing non‑governmental expert review of the design documentation and state expert review to verify the accuracy of the estimated cost for the project: “Overhaul of the facades of the buildings of the Ivankovsky hydroelectric units, No. 2, No. 3, No. 6, and the barrier gates No. 103” — from 01.10.2019 to 31.10.2020.
Contract No. 0373100134619000343 dated 10/22/2019
Adjustment of the design and estimate documentation, passing the state examination of the design documentation and the state examination to verify the reliability of determining the estimated cost of the facility: "Development and implementation of a comprehensive project for the reconstruction of infrastructure facilities of the Moscow Canal" stage 2. Reconstruction of the Beloomut hydraulic complex (sub‑stage 4) — from 22.10.2019 to 29.02.2020.
Contract No. 0373100134621000222 dated 05.10.2021.
Adjustment of design and survey work for the project: Major repair of the bridge crossing over Dam No. 21 and Hydroelectric Power Station No. 191 — from 05.10.2021 to 30.10.2022.