LLC “TsIK”, Moscow
Contract No. 09/08-22/1-SUB7 dated 13.04.2023
Development of design documentation for the sections “Process solutions”, “Process solutions (ATKh)”, “Construction management plan”, “Traffic management plan”, “Demolition and dismantling management plan”, “Measures to meet energy-efficiency requirements and to equip buildings with meters for energy resources used”, “List of civil-defense measures and measures to prevent natural and man-made emergencies”, and “Measures to ensure the antiterrorist protection of buildings and structures” for the project “Reconstruction and technical re-equipment of the test-stand base and infrastructure for testing engine components and a carbon-fiber fan blade”, Federal Autonomous Institution “Baranov Central Institute of Aviation Motors”, Lytkarino, Moscow Region — from 13.04.2023 to 08.06.2023
Contract No. 19/04-PIR dated 19.04.2023
Preparation of design and estimate documentation for the project: “Technical re-equipment of the production base of JSC “UEC-Klimov” to support the production program for a family of helicopter engines”, Joint Stock Company “UEC-Klimov”, St. Petersburg — from 19.04.2023 to 23.12.2024
Contract No. GZ-2/SUB5 dated 13.04.2023
Revision of the design documentation for construction (reconstruction) of the capital project “Technical re-equipment and reconstruction of the high-altitude hypersonic test stand, stage 2” within budget investments in capital construction under the state defense order, and support of the design documentation when the lead contractor submits it for the state expert review — from 13.04.2023 to 15.10.2023
Contract No. 09/08-22/1-SUB7 dated 13.04.2023
Development of design documentation (stage P) for the project: “Reconstruction and technical re-equipment of the test-stand base and infrastructure for testing engine components and a carbon-fiber fan blade”, Federal Autonomous Institution “Baranov Central Institute of Aviation Motors”, Lytkarino, Moscow Region (phase 2) — from 13.04.2023