LLC “Severstal-Proekt”
Work Contract No. SP44-18 dated 01.01.2018
Pre-design studies and development of design and working documentation based on the Customer's orders — from 01.01.2018 to the present
Order No. 1 dated 01.02.2018
Development of working documentation for the project: PJSC “Severstal” KADP. Equipment for laboratory briquetting at TsIS (TX, EM, EO, OV, SS) — from 01.02.2018 to 14.05.2018
Order No. 2 dated 09.02.2018
Development of working documentation for the project: PJSC “Severstal” KADP. AGC-2. Four-roll crusher with smooth rolls (OSK, TX, KZh). Inspection of building structures — from 09.02.2018 to 15.07.2018
Development of working documentation for the project: PJSC “Severstal” KADP. AGC-2. Four-roll crusher with smooth rolls (OSK, TX, KZh). Development of working documentation — from 09.02.2018 to 15.07.2018
Order No. 3 dated 01.02.2018
Development of working documentation for the project: PJSC “Severstal”. PPP. TsOM-1. Roller furnace No. 1. Stack No. 2 (KM, AS, KZh, SB) — from 01.02.2018 to 30.03.2018
Order No. 5 dated 14.02.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsShP. Skull breaker for ladle residues (TX, EM) — from 14.02.2018 to 21.09.2018
Order No. 6 dated 14.02.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsIS. Induction crucible melting furnace of the ITPE series (TX, KM, KZh, AS, VK, OV, GS) — from 14.02.2018 to 16.08.2018
Order No. 8 dated 20.02.2018
Development of working documentation for the project: PJSC “Severstal” KADP. TsIS. Equipment for determining the hot strength of sinter (EM1, EM2, SS, ATKh1, ATKh2, ATKh3) — from 20.02.2018 to 14.08.2018
Order No. 9 dated 20.02.2018
Development of design and working documentation for the project: PJSC “Severstal” KADP. UPTs. Sampling point 2, UP-2 — from 20.02.2018 to 03.10.2018
Order No. 11 dated 20.04.2018
Development of working documentation for the project: PJSC “Severstal” KADP. TsShP. Mechanization of slag-pot spraying (TX, GP, VN, EM, EO, PS, TS, KZh, AS) — from 20.04.2018 to 13.08.2018
Order No. 13 dated 01.06.2018
Development of working documentation for the project: PJSC “Severstal”. DpR. USO LPC-2. SP PP. Service platform for the hydraulic equipment of lifting table No. 3 at the receiving position of slab transfer car No. 3 (KM, KZh) — from 01.06.2018 to 15.07.2018
Order No. 14 dated 01.06.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), ATKh — from 01.06.2018 to 31.08.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), AS — from 01.06.2018 to 31.08.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), AS1 — from 01.06.2018 to 31.08.2018
Order No. 16 dated 08.06.2018
Development of working documentation for the project: PJSC “Severstal”. TsTK. Installation for cyclic strength and fatigue endurance tests (stage 1, sections TX, KZh, KM) — from 08.06.2018 to 08.08.2018
Development of working documentation for the project: PJSC “Severstal”. TsTK. Installation for cyclic strength and fatigue endurance tests (stage 2, sections EM, EO, PS, VS, OV) — from 08.06.2018 to 07.09.2018
Order No. 18 dated 22.06.2018
Development of working documentation for the project: PJSC “Severstal”. UGE. TsVS. Relocation of the discharge point of slurry pumped by ZS-402 to map No. 1 of ZShN-2 (GP, VK) — from 22.06.2018 to 05.10.2018
Order No. 19 dated 02.07.2018
Development of working documentation for the project: Promservice Center. Refractory service production. Reconstruction of the dust-removal (aspiration) system of conveyor No. 13 at UOP (section OV) — from 02.07.2018 to 20.08.2018
Reconstruction of the dust-removal (aspiration) system of conveyor No. 13 at UOP (section OV)
Order No. 20 dated 02.07.2018
Development of working documentation for the project: PJSC “Severstal” AGC-3. Chemical composition analyzers of the sinter mix (2 pcs.) (TX, EM, EO, PS, ITS, OV, KM, AS) — from 02.07.2018 to 17.12.2018
Order No. 21 dated 21.06.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Equipment for laboratory briquetting at TsIS (AS) — from 21.06.2018 to 29.06.2018
Order No. 22 dated 02.07.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Equipment for laboratory briquetting at TsIS (washing unit) — from 02.07.2018 to 16.07.2018
Order No. 24 dated 16.07.2018
TsRSO. Rolling-mill roll degreasing unit OTR — from 16.07.2018 to 30.10.2018
Development of working documentation for the project: TsRSO. Rolling-mill roll degreasing unit. Project sections: TK, TX, SB, OV, ATKh, KZh, KM, AS, PZ, ES, EM, VK — from 16.07.2018 to 25.01.2019
Order No. 25 dated 05.07.2018
Development of working documentation for the project: PJSC “Severstal”. AGC-3. Chemical composition analyzers of the sinter mix (2 pcs.) — from 05.07.2018 to 28.11.2018
Order No. 27 dated 09.07.2018
Development of working documentation for the project: PJSC “Severstal”. PPP. PTsM-1. Manufacture and installation of the control desk for the head section of ANGC at the strip inspection and defect-cutting platform (ATKh, SS) — from 09.07.2018 to 17.09.2018
Order No. 28 dated 23.07.2018
Development of working documentation for the project: PJSC “Severstal”. DpR. ElRTs. Leaching bath (replacement) (sections TX, OV, TS, VS, VK, EM, KZh, KM) — from 23.07.2018 to 05.11.2018
Order No. 29 dated 06.08.2018
Development of working documentation for the project: PJSC “Severstal”. TsTK. Salt-spray chamber for the PKhP laboratory of TsLO TsTK — from 06.08.2018 to 19.11.2018
Order No. 30 dated 01.08.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsIS. Induction crucible melting furnace ITPE — from 01.08.2018 to 14.09.2018
Order No. 31 dated 01.08.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsShP. Mechanization of slag-pot spraying (ATKh) — from 01.08.2018 to 05.09.2018
Order No. 32 dated 13.08.2018
Development of working documentation for the project: PJSC “Severstal”. Electrical repair production. Replacement of the loading and unloading ramp of the UPA charging station, sections TX, KZh, KM — from 13.08.2018 to 24.09.2018
Development of working documentation for the project: PJSC “Severstal”. Electrical repair production. Replacement of the loading and unloading ramp of the UPA charging station, sections EM, EO — from 13.08.2018 to 15.10.2018
Order No. 33 dated 13.08.2018
Development of working documentation for the project: PJSC “Severstal”. TsTK. Temperature and humidity chamber for climatic tests in the PKhP laboratory of TsLO, sections TX, EM, OV, VK — from 13.08.2018 to 07.11.2018
Order No. 34 dated 13.08.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Equipment for determining the hot strength of sinter (section KM) — from 13.08.2018 to 30.08.2018
Order No. 35 dated 17.08.2018
Development of working documentation for the project: PJSC “Severstal”. PPP. LPC-2. Bay D–E, rows D and E, axes 47–72. Design for changing the railing along row E and installing a safety rope along the crane rail of row D (KM) — from 17.08.2018 to 08.10.2018
Order No. 37 dated 23.08.2018
Development of working documentation for the project: PJSC “Severstal”. SPP. Mill 250. Two-strand slitting rolling (section VK) — from 23.08.2018 to 07.09.2018
Order No. 41 dated 03.09.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. TsIS. Induction crucible melting furnace ITPE (sections OV1 and AS1) — from 03.09.2018 to 24.09.2018
Order No. 43 dated 10.09.2018
Development of working documentation for the project: PJSC “Severstal”. AGC-2. Conveyor A-7. Exhaust duct from the charging hopper connected to the existing systems (sections TX and KM) — from 10.09.2018 to 30.10.2018
Order No. 44 dated 17.09.2018
Development of working documentation for the project: PJSC “Severstal”. AGC-3. Compressed-air drying system at UPI-2 and the pneumatic tube system of AGC-3 (sections VS, NVK, ES) — from 17.09.2018 to 30.11.2018
Order No. 45 dated 10.10.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Blast furnace complex No. 3 (relocation of the gas mixing station out of the burden-supply construction zone, option No. 2). Sections KM, KZh, GSN, TS, AK — from 10.10.2018 to 30.10.2018
Verification calculations for steel structures — from 10.10.2018 to 30.11.2018
Order No. 47 dated 13.09.2018
Development of working documentation for the project: PJSC “Severstal”. PPP. KhP. TsOM-3 machine shop. Installation of gate No. 33 (EM) — from 13.09.2018 to 10.10.2018
Order No. 48 dated 13.09.2018
Development of working documentation for the project: PJSC “Severstal”. PPP. KhP. TsOM-3 dispatch area. Installation of gate No. 26 (EM) — from 13.09.2018 to 10.10.2018
Order No. 49 dated 24.09.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. DP-2. Platforms for safe maintenance of the radar probe — from 24.09.2018 to 08.11.2018
Work Contract No. SP45-18 dated 01.01.2018
Development of design and working documentation based on the Customer's orders
Assignment order No. 3 dated 14.05.2018
Development of working documentation for the project: PJSC “Severstal” KADP. TsPCh. Embedment for the burden-level radar on the dome of blast furnace DP-2, from 01.01.2018 to 31.12.2018 (from 14.05.2018 to 20.07.2018)