LLC “Severstal-Proekt”
Work Contract No. SP44-18 dated 01.01.2018
Pre-design studies and development of design and working documentation based on the Customer's orders — from 01.01.2018 to the present
Order No. 4 dated 14.02.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Relocation of 10 kV cable lines from switchgear 129,52 KADP (sinter) to substations 129A and 52Zh KADP (iron) in the UZOM building, out of the cable tunnel (CHP–AGP) (ES, KM) — from 14.02.2018 to 25.07.2018
Order No. 7 dated 15.02.2018
Development of design and working documentation for the project: PJSC Severstal. UGE. TsES. Transfer of cable lines onto trestles and galleries. Cable trestle “CHP–PVS–Oxygen” (design documentation in full except sections 8 and 11; working documentation in full) — from 15.02.2018 to 05.07.2018 and from 15.02.2018 to 12.10.2018
Order No. 10 dated 20.03.2018
Development of working documentation for the project: PJSC “Severstal” KADP. Blast furnace complex No. 3 (relocation of the gas mixing station out of the burden-supply construction zone) (TX, KM, KZh, AS, VK, TS, GS, EM, ATKh (instrumentation)) — from 20.03.2018 to 25.07.2018
Order No. 12 dated 26.04.2018
Development of design and working documentation for the project: PJSC “Severstal” UGE. TsES. Transfer of cable lines onto trestles and galleries. Cable trestle “CHP–PVS–Oxygen” — from 26.04.2018 to 05.07.2018 and from 26.04.2018 to 12.10.2018
Order No. 15 dated 01.06.2018
Development of working documentation for the project: PJSC “Severstal”. UGE. TsSTs. Power engineering section of LPC-2. Installation of a plate steam-water heat exchanger in hot-water boiler house No. 2 (KM, AS) — from 01.06.2018 to 23.07.2018
Order No. 17 dated 24.05.2018
Development of working documentation for the project: PJSC “Severstal”. Iron production. Design of additional storm sewerage and a drainage system for substation No. 98 of KC-1 (GP, NVK) — from 24.05.2018 to 23.07.2018
Order No. 18 dated 22.06.2018
Development of working documentation for the project: PJSC “Severstal”. UGE. TsVS. Relocation of the discharge point of slurry pumped by ZS-402 to map No. 1 of ZShN-2 (GP, VK) — from 22.06.2018 to 05.10.2018
Order No. 26 dated 05.07.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Relocation of 10 kV cable lines from switchgear 129,52 KADP (sinter) to substations 129A and 52Zh KADP (iron) in the UZOM building, out of the cable tunnel (CHP–AGP) (KZh) — from 05.07.2018 to 15.10.2018
Order No. 36 dated 04.10.2018
Development of working documentation for the project: PJSC “Severstal”. UGE. TsES. Transfer of cable lines onto trestles and galleries. Cable trestle “CHP–PVS–Oxygen”. Relocation of utilities out of the cable-trestle construction zone (NVK, ES) — from 04.10.2018 to 07.11.2018
Order No. 42 dated 10.09.2018
Development of working documentation for the project: PJSC “Severstal”. DpR. TsPK. Power supply diagram for the compressors and the auxiliary switchboard of TP-133. Electricity metering in accordance with the wholesale market requirements (sections EM, ES, SS) — from 10.09.2018 to 22.11.2018
Order No. 51 dated 27.11.2018
Development of working documentation for the project: PJSC “Severstal”. KADP. Calculation of the required capacity of pump units Nos. 4 and 5 at the treatment facilities of KC-2 (KZh, VK, EM) — from 27.11.2018 to 25.02.2019
Work Contract No. SP45-18 dated 01.01.2018
Development of design and working documentation based on the Customer's orders — from 01.01.2018 to 31.12.2018.
Assignment order No. 1 dated 20.04.2018
Development of working documentation for the project: DpR. ElRTs. Production building, row A–B, axes 15–16. Decommissioning of distribution substation 5A — from 20.04.2018 to 25.06.2018
Assignment order No. 4 dated 22.05.2018
Development of working documentation for the project: UGE. TsES. Networks section. Relocation of the 10 kV jumper cable line GPP-12–CHP EVS2 out of the ground, with cable replacement — from 22.05.2018 to 22.08.2018
Assignment order No. 5 dated 22.05.2018
Development of working documentation for the project: PPP. KhP. TsTM. Installation of push-button lighting control stations in electrical rooms — from 22.05.2018 to 22.07.2018
Assignment order No. 6 dated 10.09.2018
Development of working documentation for the project: DpR. ElRTs. Production building, row A–B, axes 15–16. Decommissioning of distribution substation 5A — from 10.09.2018 to 04.10.2018
Assignment order No. 7 dated 06.11.2018
Development of working documentation for the project: DpR. ElRTs. Production building, row A–B, axes 15–16. Decommissioning of distribution substation 5A — from 06.11.2018 to 19.12.2018