LLC “Severstal-Proekt”

Work Contract No. SP44-18 dated 01.01.2018

Pre-design studies and development of design and working documentation based on the Customer's orders — from 01.01.2018 to the present

Order No. 8 dated 20.02.2018

Development of working documentation for the project: PJSC “Severstal” KADP. TsIS. Equipment for determining the hot strength of sinter (EM1, EM2, SS, ATKh1, ATKh2, ATKh3) — from 20.02.2018 to 14.08.2018

Order No. 10 dated 20.03.2018

Development of working documentation for the project: PJSC “Severstal” KADP. Blast furnace complex No. 3 (relocation of the gas mixing station out of the burden-supply construction zone) (TX, KM, KZh, AS, VK, TS, GS, EM, ATKh (instrumentation)) — from 20.03.2018 to 25.07.2018

Order No. 14 dated 01.06.2018

Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), ATKh — from 01.06.2018 to 31.08.2018

Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), AS — from 01.06.2018 to 31.08.2018

Development of working documentation for the project: PJSC “Severstal”. KADP. TsPKhP No. 2. Separator-water collector of the benzol section (replacement), AS1 — from 01.06.2018 to 31.08.2018

Order No. 24 dated 16.07.2018

TsRSO. Rolling-mill roll degreasing unit OTR — from 16.07.2018 to 30.10.2018

Development of working documentation for the project: TsRSO. Rolling-mill roll degreasing unit. Project sections: TK, TX, SB, OV, ATKh, KZh, KM, AS, PZ, ES, EM, VK — from 16.07.2018 to 25.01.2019

Order No. 27 dated 09.07.2018

Development of working documentation for the project: PJSC “Severstal”. PPP. PTsM-1. Manufacture and installation of the control desk for the head section of ANGC at the strip inspection and defect-cutting platform (ATKh, SS) — from 09.07.2018 to 17.09.2018

Order No. 31 dated 01.08.2018

Development of working documentation for the project: PJSC “Severstal”. KADP. TsShP. Mechanization of slag-pot spraying (ATKh) — from 01.08.2018 to 05.09.2018